Process: The first bulk order customer for this style requested logo design and high-precision silk screen printing.
Solution: We displayed the logo model on the product in proportion, adjusted it three times, and opened the logo fixture for mass production.

AURINDA
Process: Logo hot stamping process.
Solution: In order to achieve a high-end effect, different paints were tested and adjusted for color matching.

AMore
Process: Thin edge logo hot stamping process.
Solution: This process is prone to solving the problem of unstable logo pasting by controlling the temperature due to the precision of the text.

My+Cee
Challenge: Stringent cleanliness and mold-changing protocols.
Solution: Established a dust-free workshop and assigned dedicated staff for maintenance and cleaning.

〓 W △
Challenge: Logo adjustments through multiple iterations.
Solution: Refined the process with client feedback to meet expectations.

YPEPRO
Challenge: High cost and uniformity in logo placement.
Solution: Utilized custom molds and fixtures for accurate application.

FUZZLE
Challenge: High client standards for color precision.
Solution: Collaborated on-site for multiple adjustments and samples until approval.

MOVE
Challenge: Printing on slightly curved surfaces with large UV areas.
Solution: Adjusted design edges for seamless integration.

NURTICooE
Challenge: Achieving uniform color across different materials.
Solution: Fine-tuned UV layers for consistent results.

HYJERYTY
Challenge: Strict control over molds, pressure, temperature, and positioning.
Solutions: Optimized processes for glossy black PC material, ensuring flawless assembly and protection.

EACHYLIFE
Challenge: Achieving premium texture using silver ink.
Solution: Adjusted paint and printing processes for a luxurious finish. Applied unique mold treatments for frosted transparency.

PHARAMA
Challenge: Low efficiency due to high-temperature baking needed for ink adhesion.
Solution: Upgraded equipment to ensure stable ink curing and quality.

SWISS
Challenge: Large order of 100,000 units with a one-month lead time.
Solution: Enhanced UV production by adding equipment and assembly lines. Met stringent precision requirements for UV devices.